Justin Tucker, E.I.

Ridge & Associates, Inc.
 

 

Blendstar, LLC, Birmingham, AL: Project Lead for the Process & Civil Design of the Railcar to Truck Ethanol Transfer Facility (2011).

 

Sterling Services, Hamtramck, MI: Designer and project lead for redesign of product offload area (2010).

Sunoco Logistics, Various Locations: Designer and project lead for biodiesel injection systems at Sunoco terminals servicing PA (2009-2010).

Murphy Energy, Kingfisher, OK: Designer and project lead for NGL Pipeline Injection Facility (2009).

IC Railmarine, Convent, LA: Design engineer for tank and load rack addition (2009).

Seminole Energy, Bulls Gap, TN: Designer and project lead for MGL/MPG Railcar Facility (2008).

Reith Riley, Manistee, MI: Assisted with design of asphalt terminal (2008).

TEPPCO, Clarksville, TN: Assisted with engineering and design of "grass roots" terminal (2008).

Sunoco Logistics, Fullerton, PA: Terminal Transmix Upgrade Project (2008).

Cumberland Terminals, Nashville, TN: Ethanol Offload & Blending Addition (2008).

Sunoco Logistics, Nederland, TX: Terminal diesel rack upgrade project (2008).

BP, Various Ohio Locations: Conducted site reviews and P&ID updates for 50+ bulk facilities (2007).

Countrymark Co-op, Jolietville, IL: Terminal Hydraulic Study (2007).

TEPPCO, Boligee, AL: Pump sizing and selection for barge/truck loading terminal (2007).

Plains All-American Pipe Line, Cushing, OK: Tank farm expansion project (2006).